The project scope included replacement of black iron fire sprinkler pipe with stainless steel. Approximately 200 feet of piping was replaced, and included all fittings, butterfly valves, and OS&Y valves.
The work included isolation and draining or the existing 6″ black iron fire sprinkler line including all fittings, valves, and horizontal runs to the vertical sections. This project was completed with careful coordination between the VA.