Apollo’s full mechanical design assist scope included BIM/CAD lead, HVAC, plumbing and controls. In total, 665 pieces of equipment were installed, including 2 chillers, 3 cooling towers, 3 boilers, 86 FCUs, 72 reheat coils, 222 Phoenix air valves, 6 AHUs and 6 MAUs. Copper, Stainless, Carbon, Cast, PP Fusion, Thermacor and Orion were among the 25 different types of piping systems installed. The HVAC system included 60″ welded stainless lab exhaust.