Denver Public Schools – Washington High School MEP Upgrades

Apollo’s scope was full mechanical and included workers replacing (11) RTU’s and working with RMS cranes on the hoisting and rigging, installing a new pool boiler and piping, and replacing the (3) domestic water boilers and associated piping.