After performing a Preliminary Energy Analysis it became very clear that the City of Colville had a prime location at their Wastewater Treatment Plant for a fixed array to be net metered to that electrical service.
Apollo was successful in applying for, and securing both solar grants on behalf of the City of Colville. The City has entered into a net metering agreement with Avista Utilities for a 100 kW Fixed Solar Array which will cover nearly 40% of the Treatment Plants energy production.
Relevant Project Details:
- Secured a Department of Commerce Energy Grant = $254,000
- Secured a TransAlta Energy Technology Grant = $260,000
- Fixed 100 kW Photo-Voltaic Solar Array. Energy Cost Produced per year = $8,635.
- Guaranteed Annual Electrical Production of 110,700 kWh/Year.