Central Washington Hospital Lab TI

Challenges associated with this project included working in and around a working hospital and functioning kitchen, and coordinating duct and piping above a ceiling with limited space.

Apollo utilized 3D scanning and imaging on this project. This gave the owner extra confidence that Apollo was going above and beyond to make sure these systems fit within the existing structure Apollo’s scope included hydronic piping, steam piping, ductwork and HVAC equipment including two air handlers and multiple exhaust fans.